Bemco Low Voltage Switchboard – Case Study.
Bemco carried out the full survey of the existing panelboard at our site in Glasgow, which we found to be obsolete. We then proceeded to price up and offer the client a new Panel Board with Suitable Surge Protection. This offer was taken by the client and we ordered and changed the full switch board over to satisfaction of ourselves and Consultants.
Chris Bryant CIWFM
Group Managing Director
Existing Switchboard.
The switchroom was located in the basement of an old building within the heart of Glasgow’s city centre. The existing cables were removed from the old switchboard by the electrical contractor prior to Bemco engineers dismantling and removing the old switchboard from the switchroom. The new switchboard was designed so that the existing cables could be utilised where possible.
New Switchboard.
Due to the switch room’s location the switchboard was delivered flat pack in component parts and assembled on site within the switch room. The new switchboard was fully tested prior to the electrical contractor reinstalling and terminating the existing cables.
Bemco – Case Study.
Derek Mitchell Group have been installing Bemco products for 20+ years and continue to do so, the staff are very helpful and friendly. The team at Benco always find a solution to our problems and deliver a quality product meeting our time scales.
Iain Currie – Group Manager